In the heart of Bathurst, New Brunswick, a groundbreaking project unfolded. This venture saw the creation of a vital piece of infrastructure: 40 km of overhead 34.5 kV collector system, a cutting-edge 138 / 34.5 kV substation, and a robust 138 kV transmission line that seamlessly integrates into the NB Power grid.
Our involvement as contractors for the substation and collector system was pivotal, reflecting our expertise and commitment to excellence in every facet of the project. The construction of this infrastructure was not just about enhancing the electrical grid; it was about setting a new standard for reliability, efficiency, and harmony with the surrounding environment.
The project was more than an infrastructure upgrade; it was a testament to forward-thinking engineering and a commitment to the community's long-term energy needs. Our role in bringing this vision to life underscores our dedication to delivering projects that are not only technically sound but also beneficial to the communities they serve.
Through meticulous planning, innovative engineering solutions, and a steadfast commitment to quality and safety, we played a crucial role in ensuring the success of this project. The result is a robust electrical infrastructure that stands ready to meet the demands of the future, solidifying our reputation as leaders in the construction and energy sectors.
Copyright © 2024 International Power Limited - All Rights Reserved.